1. Pier spacing must be in accordance with the

Manufacturers Installation Manual and/or

State or local requirements.

2. Clear all vegetation and debris from area

where pads are to be placed.

3. The ground under the pads must be leveled

and evenly compacted or undisturbed soil.

4. Determine pad size by testing for the soil

bearing capacity, if soil testing not available,

use the 1000 PSF soil column of

the instructions.

5. Place ABS pad with grid side up, smooth side

down. Center blocks or pier on pad and

complete Installation.

General Notes:
1. Any configuration from the chart may be used

to replace a concrete or wood base pad per

3282.312(A)(3).
2. The maximum load at any intermediate soil

value may be interpolated between the next

lower and next higher soil values given in the

pad bearing capacity chart.

3. Pad sizes are shown in nominal dimensions

and may vary slightly.

4. Maximum deflection 3/8”, measured from the

highest point to the lowest point of the top

side of pad.

5. In areas susceptible to frost heave, the pad

must be at the frost line or otherwise

protected from the effects of frost. Refer to

NCSBCS/ANSI A225.1 “Manufactured Home

Installations” Homes set to Standard

24 CFR 3285 should not be susceptible to

frost heave.

ABS Foundation Pad Installation Instructions

Good

Bad

3/8”

021312,D1236

Advertising