Rack mounting, Control settings, Dimensional diagram – Toa A-724 User Manual

Page 8

Advertising
background image

8

8. RACK MOUNTING

To mount the unit in a standard 19" equipment rack, use the optional MB-25B Rack Mounting Bracket.
Attach the MB-25B to the unit using the supplied 4 screws. When using other screws, each screw must be
shorter than 16 mm.

MB-25B

M4 x 16 Machine screw included in MB-25B

Amplifiers

PF-511 (optional)

Note
Use the optional PF-511 Perforated Panels to
provide sufficient ventilation when mounting 2
or more units in an equipment rack.

9. CONTROL SETTINGS

Output levels are adjustable with individual volume controls.
For music play or announcements, adjust the corresponding
volume control so that the red indicator doesn't light. Note
that the sound quality is downgraded when the red indicator
remains lit.
To prevent the accidental change of the settings of input
volume and tone (Bass and Treble) controls, remove their
knobs after setting them to the desired position and attach
the supplied or optional YA-920 Volume Control Covers
instead.

INPUT

1

BASS

IMPUT

2

YA-920

Control knob

10. DIMENSIONAL DIAGRAM

(Applicable to all models)

88.4

107.7

420

326.5

18

7

Unit: mm

This figure represents the A-724.

Advertising
This manual is related to the following products: