Electrical shock hazard can cause severe
personal injury, death or substantial prop-
erty damage. Disconnect power before
installing and/or servicing.

1. All wiring must be a minimum of 18 gauge

and installed in accordance with:

U.S.A. - National Electrical Code and any
other national, state or local code require-
ments having jurisdiction.

Canada - C.S.A. C22.1 Canadian Electrical
Code Part 1 and any other national, provin-
cial and local code requirements having
jurisdiction.

2. If original wire supplied with appliance must

be replaced, Type 90ºC or its equivalent must
be used.

3. Refer to control component instructions

packed with boiler for application information.

4. An optional service switch may be installed in

water heater electrical circuit. This switch
would only shut off the water heater, not the
home heating system. Do not shut off water
heater if there is a chance of freezing.

5. All electrical contacts shown do not have

power applied - off the shelf condition. See
pages 16 thru 19.

Circulators

Priority relay must be sized for total amp draw
of all circulators.

Zone Valves

Transformer must be sized for maximum load
of all zone valves.

Snap Set Connection

For easy wiring between water thermostat and
boiler controls see Installation Wiring section
pages 16 through 19.

Make sure snap set is firmly snapped together
after wiring.