TYPICAL INSTALLATION

MOUNTING

(New Frame Construction)

CEILING

JOIST

(24” centers

shown)

10” ROUND DUCT

GRILLE

Install after ceiling is

finished.

MOUNTING

SCREW

GRILLE SCREW

Blower factory-shipped

in horizontal

discharge position.

Mounting brackets

factory-shipped in

position for ½”

ceiling material.

MOUNTING

(Existing Frame Construction)

TYPICAL INSTALLATION

WIRING

WIRING

PLATE

WHITE

TO

WHITE

BLACK

TO

BLACK

TOP / BACK

OF HOUSING

120 VAC LINE IN

GROUND TO

WIRING PLATE

10” ROUND

DUCT

GRILLE

SCREW

FINSHED

CEILING

MATERIAL

GRILLE

CEILING JOIST

(24” centers

shown)

2 X 4 FRAMING

(wide side down)

MOUNTING

BRACKETS

(Attached to

opposite sides

of housing &

upside-down,

so housing is

flush with

finished ceiling)

DUCTING

(Horizontal blower discharge)

ROOF CAP

10”

ROUND

ELBOW

10”

ROUND

DUCT

WALL

CAP

NOTE: Make sure the shipping tape is removed from the damper

flap and that damper flap opens and closes freely inside the

ductwork. Use duct tape to make ductwork connections secure and

air-tight.

4½” X 18½”

TO 10” ROUND

TRANSITION

MOUNTING

SCREW

4½” X 18½”

TO 10” ROUND

TRANSITION

4½” X 18½”

TO 10” ROUND

TRANSITION

Factory-shipped unit installed in new construction.

Factory-shipped unit installed in existing construction.

Two ways to connect ductwork to a factory-shipped unit.

Ventilator can be wired from outside of housing.

Use UL approved connectors to wire per local codes.