Motorola SG2-DRT-3X User Manual

Page 9

Advertising
background image

STARLINE 9

SG2-DRT-3X Installation Sheet

To install the SG2-DRT-3X in the SG2000 node:

1

If present, remove any analog transmitter that occupies the optical transmitter B or A

positions as illustrated in Figure 9, and then install the double-wide SG2-DRT-3X:

Figure 9

SG2000 optical transmitter B and A locations

Power

supply 1

Power

supply 2

Optical

transmitter B

Optical

transmitter A

Optical

receiver C

Optical

receiver B

Optical

receiver A

JP1

Pad - optical transmitter B

Pad - optical receiver C

Pad - optical transmitter A

Pad - optical receiver B

Pad - optical receiver A

Test point - optical transmitter B

Test point - optical receiver C

Test point - optical transmitter A

Test point - optical receiver B

Test point - optical receiver A

JP2

2

Verify that the XMTR B 15 dB pad has been replaced with a 5 dB pad.

3

Remove all cable clamps and then remove the E-pack cover to identify the two RF ports that

you want to segment.

4

Remove the pad located in the ICS locations (illustrated in Figure 10) for the selected

RF ports.

If there was a JXP pad in the ICS location, transfer that value to the JXP location before the

ICS input.

Advertising