VACUUBRAND RZ 8 User Manual

Page 12

Advertising
background image

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. Manual-no.: 99 90 77 / 17/04/2008

page 12 of 20

Shutdown:

Has the pump been exposed to condensate?
☞ Allow the pump to continue to run at atmospheric pressure with gas ballast valve

open for a few minutes.

Short-term:
➨ A restart is only possible after two minutes (cool-down period of start-up control

(PTC thermistor)).

Long-term:
➨ Separate pump from the apparatus.

➨ Flush pump with dry nitrogen.

➨ Change oil.

➨ Fill the pump completely with new oil (more than mark Max.!).

➨ Close manual gas ballast valve.

➨ Close inlet and outlet port (e. g. with transport caps or blind flanges).

➨ Store the pump in dry conditions.

➨ If necessary carry out oil change and maintenance prior to use if the pump is stored

longer than one year.

Advertising
This manual is related to the following products: