Carrier

INSTALLATION

50K

TABLE 4

High Press. Switch

Low Press. Switch

Refrig.

Cut-In

Cut-Out

Cut-In

Cut-Out

22

284

364

83

46

500

218

265

67

30

NOTE* If the liquid refrigerant bleeds from the

liquid level check port on the receiver but

there is stUl flashing at the sight glass,
there is an indication that there is a re­

striction in the liquid line or filter-drier.

Let the system operate for 20 minutes to balance
out and recheck the refrigerant and oil levels.

SPORLAN SEE-ALL MOISTURE AND

LIQUID INDICATOR

The moisture and liquid indicator must be full of
liquid refrigerant to properly indicate the moisture
content of the refrigerant. Operate the system at

least 30 minutes before attempting to determine the
moisture reading.

CHARGING PROCEDURE

The receiver has a bleeder port at the top to bleed
non-condensables from the system. There has to

be sufficient refrigerant in the system to make a
liquid seal at the outlet of the receiver to trap the
non-condensables in the top of the receiver before
the bleeder port can be effective.

WIRING

The crankcase heater elements, heater relays, and
the condenser fan relays are to be field wired. See
Wiring Diagrams.

The compiete refrigerant system should be evacuated
with a good vacuum pump before charging with refrig­

erant. When charging, connect a cylinder of refrig­
erant through a tee to a gauge and to the gauge port

on the compressor service valve. Have the cylinder
in the upright position to admit vapor only. Admit re-
refrigerant to break the vacuum in the system. Start

the compressor and modulate the valve on the cylinder
to keep the suction pressure slightly under 50 psig.
Charge the system until liquid refrigerant will bleed

from the liquid level check port on the receiver and
also until the sight glass is clear. *

The crankcase heater relays are single pole, single
throw, normally closed, relays . Each crankcase

heater element is to be energized when its respec­
tive compressor is "OFF.”

The condenser fan relays (S.P.S.T. Normally open)
are to be mounted per the condenser Installation In­
structions . The control voltage is supplied by the

base unit. Follow the right wiring diagram so the
condenser fans wUl continue to run if the compres­
sor is shut down by one of its protective devices

and the thermostat is stUl calling for cooling.

SIDE ELEVATION

FRONT ELEVATION

NOTE. ALL DIMENSIONS ARE TO

1

OUTSIDE OF CASING, NOT

I

TO OUTSIDE OF PANEL.

EXPANSION VALVE

EXPANSI

COMPRESSOR

DISCHARGE VALVE

48

FIG. 1 - LOCATION OF COMPRESSOR DISCHARGE AND LIQUID CONNECTIONS 50K8

Advertising