Carrier 50YQ User Manual

Single-package heat pumps, Installation, start-llp and service instructior

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Jrt<twnna y >'

^

Numb^One
AirConditbning
Maker

e

Division of
Carrier Cotporalio

installation, Start-llp
and Service instructior^

Carrier Parkway • Syracuse NY 13221

Single-Package Heat Pumps

INDEX

Page

1

, 1-4

. 1

SAFETY CONSIDERATIONS .........................
INSTALLATION.................................................

Step 1 — Check Equipment and Jobsite

• UNPACKAGE UNITS
• INSPECT EQUIPMENT
• COMPLETE OR CONSIDER SYSTEM

REQUIREMENTS

Step 2 — Mount Heat Pump Package ..

• ON THE GROUND: MOUNT HEAT

PUMP ON AN ELEVATED FRAME
POSITIONED ON A LEVEL CON­
CRETE PAD

• ON THE ROOF: MOUNT UNIT ON A

LEVEL PLATFORM OR FRAME

Step 3 — Make Ductwork Connections

• CONNECT SUPPLY AND RETURN

AIR DUCTWORK

^

SAFETY CONSIDERATIONS

Installation and servicing of air conditioning

equipment can be hazardous due to system pressure
and electrical components. Only trained and quali­
fied service personnel should install, repair or

service air conditioning equipment.

Untrained personnel can perform basic main­

tenance functions of cleaning coils and filters and
replacing filters. All other operations should be per­
formed by trained service personnel. When working

on air conditioning equipment, observe precautions
in the literature, tags and labels attached to the unit
and other safety precautions that may apply.

Follow all safety codes. Wear safety glasses and

work gloves. Use quenching cloth for brazing oper­
ations. Have fire extinguisher available for all braz­
ing operations.

Step 4 — Provide for Cooling Cycle
Condensate Disposal for Cooling Cycle

... 4

• CONNECT DRAIN LINE

^Step 5 — Make Electrical Connections

... 4

• INSTALL A BRANCH CIRCUIT

DISCONNECT PER NEC

• ROUTE LINE POWER WIRES INTO

UNIT

• CONNECT GROUND LEAD TO GROUND

LUG IN SPLICE BOX FOR SAFETY

• SET INDOOR FAN MOTOR SPEED
• ROUTE CONTROL POWER WIRES
• ELECTRIC HEATER INSTALLATION
START-UP.............................................................5-7
SERVICE .............................................................7-14

V TROUBLESHOOTING.................................. 15, 16

INSTALLATION

Step 1 — Check Equipment and Jobsite

UNPACKAGE UNITS — Move units to final loca­
tion. Slide units from cartons taking special care nob

to damage unit.

INSPECT EQUIPMENT — File claim with ship­
ping company if shipment is damaged or incomplete.

COMPLETE OR CONSIDER SYSTEM RE­
QUIREMENTS before installing the 50YQ units.

Consult local building codes and National Elec­

trical

Code

(NEC)

for

special

installation

requirements.

Provide sufficient space for coil airflow clearance,

wiring, and servicing unit. (See Fig. 1.) Locate unit
where supply and return air ducts can be con­
veniently brought out to unit duct connections.

Unit may be placed with duct side as close to

building as condensate drain, top removal, duct con­
nections and power connections permit. Position

unit so water or ice from roof does not drop directly

on top of unit or in front of coil. Make provisions for

condensate drainage and defrost water disposal.

Roof installation method for 50YQ depends on

building construction and special requirements of
local building codes. Ensure that roof can support
unit weight. Protect unit from prevailing winds to
ensure adequate defrost.

© Carrier Corporation 1979

781

Form 50YQ-3SI

Advertising