Caution – Poulan PLN3516F User Manual

Page 9

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

3 - ASSEMBLY INSTRUCTIONS

3-i.

INTRODUCTION

This unit is designed for occasiona)

homeowner use and shouid not be used

for commercial purposes or subjected
to heavy continuous use.

Your new chain saw can be used for a
variety of projects such as cutting firewood,
making fence posts, leiling small trees,

limbing, pruning at ground level, and iighl

carpentry. Cut only wood or wood products
with your saw,

3-2. ASSEMBLY REQUIREMENTS

Your new chain saw will require adjust­
ment of chain and filling the oil tank with
lubricating oil before the unit is ready for
operation. Do not start the saw motor until

the unit is properly prepared. Read all

instructions carefully. Do not install any
other size bar and chain than what is
recommended for your model,

3-3. GUIDE BAR/SAW CHAIN

INSTALLATION

CAUTION

Disconnect the chain saw from power

souce before checking or adjusting the
chain saw tension,

TO INSTALL GUIDE BAR & SAW CHAIN:

These instructions are for replacing a bar.
The unit is fully assembled when shipped.

NOTE:

Always wear heavy gloves when

handling the saw chain.

1. Place power unit on flat surface.

2. Loosen knob (B) slightly by turning

knob counter-ciockwise and then turn

the chain tension ring (C) counter­

clockwise to relief chain tension. To
remove the sprocket cover (A), turn

knob (B) counter-clockwise, (Fig, 3-3A)

3. Remove saw chain form around the

guide bar and the sprocket. Siide the
guide bar, with tension plate (D)

attached, from the unit. (Fig. 3-3B)

4. Remove screw (C) from the tension

plate (D) to remove it from the old bar

and attach it to the new bar. (Fig, 3-3B)

5. Spread the chain out with the cutting

edges (E) of the chain pointing in the
DIRECTION OF ROTATION.

(Fig. 3-3C)

To fit the chain links into the groove on
the guide bar, turn the tension plate (D)

counter-clockwise to the end. Install

the chain and bar on the power unit,
turn the tension plate (D) clockwise and
then put the side cover (A) on.

(Fig. 3-3D)

Turn the knob clockwise, adjust the
chain tension ring (F) and then tighterr

the knob. After running the chain saw

about for one (1 ) hour - retension the

chain, if needed, based on figure 3-4A,

Advertising