Header Wall

Vertical
Centerline

Vertical
Centerline
of Garage
Door

2x4

Unfinished
Ceiling

2x4

OPTIONAL
CEILING MOUNT
FOR
HEADER BRACKET

Structural
Supports

ONE-PIECE DOOR WITHOUT TRACK

1. Close the door and mark the inside vertical

centerline of your garage door. Extend the line
onto the header wall above door, as shown.

If headroom clearance is minimal, you can install
the header bracket on the ceiling. See page 10.

If you need to install the header bracket on a 2x4
(on wall or ceiling), use lag screws (not provided)
to securely fasten the 2x4 to structural supports
as shown.

2. Open your door to the highest point of travel as

shown. Measure the distance from the top of the
door to the floor. Subtract the actual height of the
door. Add 8" to the remainder. (See Example).

3. Close the door and draw an intersecting horizontal

line on the header wall at the determined height.

NOTE: If the total number of inches exceeds the
height available in your garage, use the maximum
height possible, or refer to page 10 for ceiling
installation.

Door

Highest Point
of Travel

Header Wall

Pivot

Distance

Floor

One-piece door without track:
pivot hardware

Header Wall

Highest Point
of Travel

Door

Floor

Distance

Jamb
Hardware

One-piece door without track:
jamb hardware

EXAMPLE

Distance from top of door
(at highest point of travel) to floor ......................

92"

Actual height of door .......................................... -88"

Remainder..........................................................

4"

Add .....................................................................

+8"

Bracket height on header wall............................ =12"

(Measure UP from top of CLOSED door.)

Proceed to Step 2, page 10.