Maintenance checksheet – Bard 2100-066 Rev. A User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Maintenance Checksheet

Dealer___

_________________________________________

Customer

Date

Person

Address

Address

Time In

Time Out

Equipment Make & Models

Notes

________

Pre-Service Check

n Customer satisfied with system performance

□ Customer dissatisfied with system performance.

Thermostat Checks

□ Record thermostat settings: Temp.;_____________

Mode: HEAT OFF COOL FAN ON AUTO

□ Check terminal connections for tightness

n Clean bimetal. Inspect mercury switch

n Check thermostat for level

□ Check control circuit amperage;________________

D If customer dissatisfied with temperature control in heating season, adjust

anticipator to match control circuit amp draw

□ Initiate appropriate seasonal demand from thermostat

Blower Compartment Checks

n Check supply voltage at junction box; _

□ Check blower motor amperage;______

_________ time

nameplate rating

□ Turn power at unit main disconnect to OFF

n Check alt wiring for loose connections and bad insulation

D

Clean or change filter

Direct Drive Blower

n Check blower bearings

□ Lubricate blower bearings

□ Clean blower and compartment

□ Check blower wheel for free and balanced rotation

D

Check all blower housing mounts and setscrews for tightness

□ Unused motor leads taped and out of way

Beit Drive Blower

n Remove biower belt and check for wear

□ Check motor bearings for wear

□ Lubricate motor bearings

□ Check blower wheel bearings for wear

n Lubricate biower wheel bearings

n Clean blower and compartment

D

Check blower wheel for free and balanced rotation

□ Check pulley alignment

□ Check motor and blower pulley setscrews for tightness

D

Put belt back on blower and motor pulley and check belt tension

□ Check all biower housing and motor mounts for tightness______

Heating Section Checks
Electric

□ Check electrical wiring — connections and insulation

□ Check amperage draw of each element

□ Check total amperage draw of elements___________

□ Check temperature rise________________________

amps

F

n Return outdoor thermostats to original settings if present

Gas

□ Check ail electrical wiring for loose connections and damaged insulation

D

Check burners for lint, dust and scale

□ Check for cracks in heat exchanger

G

Check furnace vent for size and deterioration

□ Check for quiet, even burner ignition

□ Check supply line gas pressure NAT________ in. w.c, LP____________in. w.c.

D

Check manifold gas pressure NAT________ in. w.c. LP____________ in. w.c.

Electronic Ignition Control

□ Check electronic ignition control sequence of operation

D

Check safety lockout____________________ min.

n Check pressure switch_____________________

dcmv closed circuit _

_______________ min.

Standing Pilot

□ Check pilot flame

□ Check thermocouple open circuit____
□ Check pilot valve safety drop>aut time _

□ Check automatic vent damper system

□ Check iimit safety

□ Check temperature rise_________________ “F

□ Gas manifold hand valve is open before leaving

Oil

□ Check electrical wiring — connections and insulation

n Inspect combustion chamber

D inspect for soot in heat exchanger

□ Change fuel oil tank for sludge/watar

□ Change oil line filter

□ Check oil lines

D Service oil burner
□ Conduct combustion efficiency test:

__________ in.w,c, smoke_______________ %

C02.

□ Check iimit safety

□ Check temperature rise

D Check primary control
□ Check furnace vent for rust

dcmv

°F net

Cooling

□ Check electrical wiring — connections and insulation (indoor)

G

Check/clean evaporator coil

D Check/clean condensation drain

□ Check static pressure drop ___________ in. w.c. _________

□ Check wiring — connections and insulation (outdoor)

□ Check/clean condenser coil

□ Lubricate condenser fan motor

D Check line set and connections for evidence of leaks

□ Check and record supply voltage

□ Check refrigerant charge

□ Check amperage draw on condenser fan motor

□ Check amperage draw on compressor

Humidifier

□ Check electrical wiring — connections and insulation

□ Check transformer voltage_____________________

□ Check damper position

_cfm (dry coil)

Spray Type

□ Check solenoid valve

□ Check nozzle spray pattern

Drum Type

□ Check for free rotation and scale

□ Check wafer level adjustment

□ Check overflow/drain line

Electronic Air Cleaner

□ Check electrical wiring — connections and insulation

G

Check sail switch or electrical biower interlock

□ Cheekiest button operation

□ Check supply voltage_________________________

□ Check voltage to collecting ptates

□ Check voltage to ionization wires_

GTURN

power

OFF

D Wash cells

□ Wash prefilter screens

_ vac (120 vac)

vdc (3500 vdc)

^ vdc (8000 vdc)

Post-Service Checks

G

Return thermostat to original settings recorded at beginning of service call

G

Leave copy of completed checksheef wHh customer

□ Power ON before leaving

FI 385-895

Advertising