5 electrical conriection, 6 initial operation and control – AEG EL User Manual

Page 6

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Fitting the overflow pipe

Slide the fixing bush over the end of the overflow pipe.
Push the overflow pipe onto the outlet pipe which pro­

trudes from the appliance housing and secure by pres­

sing in the retaining rings.

Setting the flow control screw

In cases where the water pressure Is extremely high, the
inlet flow of the cold water can be reduced by means of

the flow control screw. Turn the screw In the direction

marked „closed“.

The cold water supply can be shut off completely by set­

ting the slot of the flow control screw exactly at right
angles to the direction of flow. Maximum flow rate is ob­
tained by setting the slot of the flow control screw in line

with the direction of flow.

In order to clean the flow control valve, turn the screw

through an angle of 180 ° and flush thoroughly.

2.5 Electrical conriection

The electrical connection must not be carried out until the appliance has been proper­

ly connected to the water supply.

When effecting the electical connection pay particular attention to the requirements of

your local electricity supply authority and any other generally applicable regulations (in
Germany: VDE 0100).

The water heater is supplied with a connection lead of a length of approx. 0.5 m which is
fitted with an earthed safety plug. It ist advisable to provide the applicae with a separate

electrical circuit.

2.6 Initial operation and control

Initial operation of the water heater must be carried out by a suitably qualified person

who is responsible for ensuring that the work is done correctly and who can explain to
the user how the appliance must be operated.

Correct operation should be ascertained during initial operation.

Important:

Possible dirt and residues resulting from installation should be removed

prior to initial operation by flushing the appliance thoroughly. Then fill the appliance

with water, bring it to the boil and then flush it a second time.

After installing the appliance please hand this instruction manual to the user!

12

Advertising
This manual is related to the following products:

GL, E