American Standard Hampton 7220.702 User Manual

Ampton, Installation instructions, Amfituftt skmíafd

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

AMfituftt Skmíafd

H

ampton

TWO HANDLE BATH/SHOWER SET

Installation

Instructions

Thank you for selecting American-Standard...the benchmark

of fine quality for over 100 years.

To ensure that your installation proceeds smoothly-

please read these instructions carefully before you begin.

Certified to comply with ANSI A11S. 18.1M

U.S. Patent No. 5,819,789

US60406 REV. 1.1

ROUGHING-IN DIMENSIONS

NOTE: NO CONCEALED PIPING FURNISHED

1-1/4 DIA HOLE—I

1/2"N.RT.

SHOWER ARM

FINISHED

WALL

□RTIONAL TO FINISHED

FLOOR USUALLY

BETWEEN 65” AND 78”

[2) 1-13/16" DIA. HOLES
FOR VALVES ON 8"
CENTERS [1] 1-13/16"

DIA. HOLE FOR CENTER

TRANSFER VALVE

1B OPTIONAL

BOTTOM OF TUB

A

Recommended Tools

Flat Blade Screwdriver

Phillips Screwdriver

Plumbers' Putty or Caulking

I

*Hex key Supplied with Fitting

Channel Locks

ROUGHING-IN

SHOWER AND SPOUT

mm

llirn off hot and cold water
supplies before beginning.

IMPORTANT: DO NOT REMOVE PLASTER GUARDS (2} UNTIL STEP 2.

Prepare water supplies per Roughing-in Dimensions. Apply sealing tape

to all threaded connections.

Install VALVE [1) at indicated height and depth. Make sure the outlet marked
"SHR" is pointing upward. Mount VALVE (11 to cross braoe with wood sorews.

Slip COUPLING NUT over supply pipe and thread UNION SWIVEL to pipe.
Conneot HOT (6| water supply to LEFT valve inlet and COLD (71 water supply
to RIGHT valve inlet.

Prepare SHOWER RISER (41 and ELBOW (31. Connect to TOP outlet, marked
"SHR" of VALVE BODY (11.

Prepare TUB FILLER PIPE (B], ELBOW (101 and roughing-in NIPPLE (91.
Connect to BOTTOM outlet of VALVE BODY (11.

Add cross braces to wall structure and secure piping.

Cap NIPPLES (9 Gi 51 and open supply lines and check for leaks. Remove
PLASTER GUARDS (21. Use spline on end of PLASTER GUARD (21 to open
both VALVES and oheok for leaks.

Close both valves and turn off water supplies. Replace PLASTER GUARDS (21.

Finish wall construction.

COUPLING

NUT

"COLD"

Advertising
This manual is related to the following products: