American Standard One T064.60X User Manual

Page 3

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ADJUST HOT LIMIT STOP

By restricting HANDLE rotation and limiting the amount of hot

water allowed to mix with the cold, the HOT LIMIT SAFETY
STOP 11J reduces risk of accidental scalding. To set the maximum

hot water temperature of your faucet, all you need to do
is adjust the setting on the HOT LIMIT SAFETY STOP llj.

Turn CARTRIDGE STEM

(2)

to the OFF position [coldest setting)

before making adjustment to HOT LIMIT STOP (1). Use a flat
blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1J.
Pull forward and rotate counterclockwise one number to limit hot

water temperature. Use ARROW

(3)

on CARTRIDGE

(4)

and NUMBERS

(5)

on HOT LIMIT STOP

(1J

for

indication.

O

(Larger Numbersl

□ 1 3 5 719 11 13 15l

TO GAIIM ACCESS TO VALVE FOR SERVICING

Unthread LEVER HANDLE, loosen SET SCREW and pull
HANDLE off valve stem.

To remove Escutcheon assembly reverse steps in Step 3.

VALVE LEAKS WHEN SHUT OFF

Remove CARTRIDGE

(1)

by removing CARTRIDGE SCREWS

(2).

Remove three SCREWS

(3)

from FIXATION RING

(4)

and pull

out PRESSURE BALANCING

(5)

unit.

Clean SEALS

(S)

on base of CARTRIDGE

(1).

Check base of

PRESSURE BALANCING UNIT

(5)

and clean 0-RINGS

(6).

Remove

CAPS

(7J

and check D-RINGS on inside of CAPS

(7J.

Clean inside

sealing surfaces of VALVE BODY (8).
Reessemble PRESSURE BALANCING UNIT

(5)

and CARTRIDGE

(1J.

Tighten all screws.
Turn on water supply and see above for installing TRIM and HANDLE.

UNABLE TO MAINTAIN CONSTANT TEMPERATURE

Remove PRESSURE BALANCE UNIT

(5).

Remove CAPS

(7)

and

clean valve thoroughly.
Examine balancing unit and check condition of 0-ring on end of
piston. Piston should move back and forth. Order Repair
Part M952100-0070A if balancing unit is defective.
Replace CAPS

(7)

and install PRESSURE BALANCE UNIT

(5).

Make sure inlets line up with two holes in bottom of casting.

Top flange should butt-up against top of casting.

BACK TO BACK INSTALLATION

Remove PRESSURE BALANCE UNIT

(5).

Rotate PRESSURE BALANCE UNIT

(5)

1 B0‘ so that the inlets face up and the

large outlet port faces down.
Push PRESSURE BALANCE UNIT

(5)

in casting make sure inlets line up with holes in bottom of casting. Top flange should

butt up against top of casting.
Reassemble FIXATION RING

(4)

and CARTRIDGE

HJ.

ROTATE 180'

INSTALL HANDLE, DIVERTER KNOB, TUB
SPOUT AND SHOWER

■ Thread DIVERTER KNOB (1) onto diverter stem.
■ Hold ADAPTER (2) onto VALVE STEM (3) and install

ADAPTER SCREW

(4)

through ADAPTER (2) into

VALVE STEM (3J.Tighten ADAPTER SCREW

(4)

to

secure ADAPTER (2) to VALVE STEM (3).

■ Install HANDLE BASE

(5)

onto ADAPTER

(2).

Insert

SET SCREW

(S)

into HANDLE BASE

(5).

Align

HANDLE BASE

(4)

and tighten with HEX WRENCH

(7) supplied.

■ Thread LEVER HANDLE

(8)

into HANDLE BASE

(5).

■ Remove pipe cap and plug from shower and tub

rough piping.

■ Install SPOUT ESCUTCHEON

(8)

onto TUB SPOUT

IIO).

■ Apply sealant or Teflon tape to threads of tub filler

nipple. Thread TUB SPOUT (10) onto tub nipple.

■ Install SHOWER ESCUTCHEON (11) onto SHOWER

ARM (12). Apply sealant or Teflon tape to threads on

both ends of SHOWER ARM (12) and thread longer
leg of SHOWER ARM (12) into shower elbow.

■ Thread SHOWER HEAD (13) onto SHOWER ARM (12).

CAUTION: Protect finish on SHOWER HEAD and

ARM when installing.

SHR.

ELBOW

BACK TO BACK INSTALLATION

M968836

Advertising