Dell 5600R OL HV-US User Manual

Page 26

Advertising
background image

26

|

Installation

Remove Jumper if

Installed

Figure 16. REPO Connector

To install the REPO switch:

1

Verify that the UPS is off and disconnected from utility power.

2

Remove the REPO connector from the accessory kit.

NOTE:

Verify that there is no jumper installed in the REPO connector. If a jumper is installed, remove it before

connecting to the REPO port. See Figure 16.

3

Connect the REPO connector to the REPO port labeled “IN” on the UPS rear panel.

CAUTION:

If you are daisy-chaining the REPO function, observe the following connection requirements to

avoid unintentional shutdown of the UPS:

S

The left pin of the REPO port labeled “OUT” on the first UPS must be connected to the left pin of the REPO
port labeled “IN” on the second UPS.

S

The right pin of the REPO port labeled “OUT” on the first UPS must be connected to the right pin of the REPO
port labeled “IN.” on the second UPS.

4

Optional.

If you are daisy-chaining the REPO function with another UPS, you can shut down the

entire system using a single switch.

Connect the second REPO connector to the REPO port labeled “OUT.”

NOTE:

A separate contact must simultaneously cause UPS input AC power to be removed.

5

Connect the switch or circuit to the REPO connector on the UPS rear panel using insulated
0.75 mm

2

–0.5 mm

2

(18–20 AWG) wire.

6

Optional.

If you are daisy-chaining the REPO function with another UPS, connect the REPO port

labeled “OUT” to the REPO port labeled “IN” on the next UPS.

Advertising
This manual is related to the following products: