8 setup steps, 9 setting up the work space, Setup steps – ADLINK HPERC-IBR-MC User Manual

Page 15: Setting up the work space

Advertising
background image

5

HPERC-IBR-M

1.8

Setup Steps

Follow the setup steps in this section in the order listed. Skip any steps that do not apply to your
application.

1.9

Setting Up the Work Space

1) Open shipping box.

• Locate the HPERC-IBR-M Contents List.
• Unpack the contents of the shipping box.

2) Verify contents.

• Verify the contents of the shipping box against the Contents List included with

your HPERC-IBR-M.

• If anything is missing or damaged, call your sales representative. Refer to the

ADLINK web page at

http://www.adlinktech.com

for contact information.

CAUTION: To prevent damage to the HPERC-IBR-M, ensure sufficient clearance exists
around the cooling solution for unrestricted airflow.
The air temperature inside the enclosure could rise above the specified operating temperature
limits if the airflow through the cooling solutionis restricted.

3) Select workbench
location.

• The workbench location should be a flat clean surface for setup and operation

(including the connection of any external peripherals and optional devices).

• Ensure sufficient airflow clearance exists around the complete enclosure.

4) Unpack
HPERC-IBR-M.

• Remove the HPERC-IBR-M from its shipping container and place it on a flat

work surface.

• The HPERC-IBR-M enclosure combined with CPU, storage (SSD), and the

desired OS form a complete system, ready for operation.

Advertising