Display Devices Outdoor Enclosures User Manual

Pe and pe-ac panel enclosures, Mechanical installation manual

Advertising
background image


11/06

tel: 303.412.0399

www.displaydevices.com

fax: 303.412.9346

[email protected]

5880 Sheridan Blvd., Arvada, Colorado 80003

1

PE and PE-AC Panel Enclosures

Mechanical Installation Manual




AIR CONDITIONED UNITS MUST SIT UPRIGHT FOR 24

HOURS BEFORE POWERING UP THE UNIT!




Every enclosure we manufacture is to your specifications.

See attached engineering drawing(s) for specific mounting information!




For wall and ceiling mounted installations, ensure the structural wall/ceiling is capable of holding
at least four times the combined weight of the flat panel and enclosure. This is a minimum

requirement. Follow any local or state codes that apply to your specific area.

Typically, door locks and the temperature control panel are hidden under access panels. See the
attached engineering drawing(s) for locations on your enclosure.

Power Requirements: (1) 15 amp circuit for air-conditioned/heated models

1. Determine mounting location and ensure there is adequate space around the enclosure

for fresh air intake and exhaust. Air conditioned models require adequate ventilation
around the air conditioning unit – consult your specific design.

2. Raise enclosure into position and attach with ½” hardware to structural wall/ceiling.

Verify enclosure is level before tightening hardware.

3. Attach the interface plate to flat panel display using the enclosed hardware. See the

attached engineering drawing.






Advertising
This manual is related to the following products: