Planning, Setting up at jobsite, Fm25 operator’s manual – Ditch Witch FM25 User Manual
Page 27
Advertising
Operation Overview - 26
FM25 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite (page 30).
2.
Inspect jobsite (page 30).
3.
Check supplies and prepare equipment (page 32).
Setting Up at Jobsite
1.
Prepare jobsite (page 31).
2.
Position fluid unit and connect to drilling unit. See drilling unit operator’s manual.
3.
Block trailer wheels.
IMPORTANT: Leave unit hitched to towing vehicle or properly stabilized.
Advertising