Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 2

Advertising
background image

2

Assembly Instructions

1.

Complete assembly of floor stand kit and bolt stand to

floor before hanging boiler onto it.

2.

Do not tighten bolts until all components are engaged/

aligned in place.

3.

Attach Base Foot into Left Base Leg at both ends using

1/4-20 x 5/8 Hex Flange Bolts and Nuts. See Figure 2

and 3.

4.

Place tapered end of brace on one Base Leg. Insert

brace into slot on Base Leg. Attach Left Upright (not

interchangeable) to Left Base Leg and Brace using 1/4-

20 x 5/8 Hex Flange Bolts and Nuts. See Figure 4.

5.

Insert Upper Cross Member into upper tab on left

upright and push tab down to engage. Screw in place.

See Figure 5.

Figure 2 - Left Side Assembly

Figure 4 - Brace to Base Leg (View from top/front of

Leg)

Left

Upright

Brace

Base Leg

Base Foot

Tapered end of

Brace

Brace engaged

in Leg slot

Base Foot

Bolt Location

Figure 3 - Foot Attached to Base Leg (View from rear

of Leg)

Left Upright

Base Leg

Base Foot

Ensure Foot is

inside notches

Figure 5 - Upper Cross Member

Left Upright

Upper Cross

Member

Advertising