Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual
Page 2
2
Assembly Instructions
1.
Complete assembly of floor stand kit and bolt stand to
floor before hanging boiler onto it.
2.
Do not tighten bolts until all components are engaged/
aligned in place.
3.
Attach Base Foot into Left Base Leg at both ends using
1/4-20 x 5/8 Hex Flange Bolts and Nuts. See Figure 2
and 3.
4.
Place tapered end of brace on one Base Leg. Insert
brace into slot on Base Leg. Attach Left Upright (not
interchangeable) to Left Base Leg and Brace using 1/4-
20 x 5/8 Hex Flange Bolts and Nuts. See Figure 4.
5.
Insert Upper Cross Member into upper tab on left
upright and push tab down to engage. Screw in place.
See Figure 5.
Figure 2 - Left Side Assembly
Figure 4 - Brace to Base Leg (View from top/front of
Leg)
Left
Upright
Brace
Base Leg
Base Foot
Tapered end of
Brace
Brace engaged
in Leg slot
Base Foot
Bolt Location
Figure 3 - Foot Attached to Base Leg (View from rear
of Leg)
Left Upright
Base Leg
Base Foot
Ensure Foot is
inside notches
Figure 5 - Upper Cross Member
Left Upright
Upper Cross
Member