CONDENSATION / EXHAUST KIT INSTRUCTIONS

Kit #550002946

Replacement kit for 90-200 BOILER

• Instructions are for replacing the exhaust tee and

condensate trap assembly with drain exiting bottom of

the exhaust tee on the 90-200 boiler allowing boiler to

properly drain.

• Particulate will collect in the drain plug on exhaust tee.

Drain plug on exhaust tee can be removed for cleaning.

• Follow instructions TO TURN OFF GAS TO APPLIANCE

found on Operating Instructions label on boiler or in

Installation, Operation & Maintenance Manual. Verify all

electrical power to boiler is turned off.

Kit Installation:

WARNING

Electrical shock hazard. Turn OFF electrical power supply at

service panel.

!

1.

Remove front jacket panel(s).

WARNING

Burn hazard. Verify heat exchanger has cooled or use

appropriate personal protection equipment.

!

2.

Cut exhaust pipe 5½" from tee flange. See figure 1.

Before cutting vertical exhaust pipe, verify it is secured

and will not fall. Cut existing exhaust pipe and edge.

See Cut A.

3.

Cut condensation line just below ½" tee. See Cut B.

4.

At boiler exhaust outlet, loosen downstream pipe clamp

on rubber coupling.

5.

Remove assembly from rubber coupling.

6.

Assemble parts 1 through 3. Thread item 4 onto tee.

Slide coupling onto existing exhaust pipe. Insert other

end into rubber coupling at boiler's exhaust outlet.

7.

Assemble remaining kit parts. See Figure 2. Assemble

drain piping then attach assembly to threaded fitting in

exhaust tee. See item 4.

8.

Cut existing condensate lines. Use new parts as guide

for measuring where to cut remainder of existing

condensation line pipes. See Cut C.

9.

Connect existing line with new ½" condensate line

coupling.

P/N 240010634 Rev. A [06/2014]

Kit installation shall be completed by qualified agency.

WARNING

Fire, explosion, asphyxiation and electrical shock hazard.

Improper installation could result in death or serious injury.

Read this instruction and understand all requirements,

including requirements of authority having jurisdiction,

before beginning installation. Installation not complete until

appliance operation verified per Installation, Operation &

Maintenance Manual provided with boiler.

!

Figure 1 - Exhaust Pipe and Condensation Line Cuts

CUT A

5-1/2”

CUT B

CUT C

10.

Verify all joints are air-tight and cemented.

11.

Verify hose clamp at exhaust outlet is tightened.

12.

Resume operation using OPERATING INSTRUCTIONS

found on Operating Instructions label on boiler or in

Installation, Operation & Maintenance Manual.

13.

Verify proper operation by following START UP

PROCEDURE in Installation, Operation & Maintenance

Manual.

14.

Install front jacket panel(s).