Caution, Alternate assembly – EarthQuake W1265B User Manual

Page 18

Advertising
background image

Operator's Manual

Trail Warrior Quick Split 12-Ton Log Splitters

Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5

18

aLTERNaTE aSSEMBLy*

Your log splitter can be assembled without the telescopic tongue

assembly for even greater portability depending on your specific

needs. Follow the alternate instructions to assemble your splitter in

this manner.

*aLTERNaTE aSSEMBLy WILL NOT WORk IN CON-

JUNCTION WITH OPTIONaL LOG CRaDLE.
1. Remove fasteners holding engine from base plate and re-

move engine. Set aside fasteners for later use.

2. Mount engine base plate to ram/beam assembly using

grade 5 (or greater) fasteners (not included in hardware

package).

Notice the positioning of the base plate and hole configu-

ration. SEE FIGURES 18 AND 19.

3. Remount engine to pre-drilled holes in base plate using the

fasteners that were previously removed. SEE FIGURE 20.

4. Install hydraulic valve control lever. Secure with pin and cot-

ter key. SEE FIGURE 21

STaRTING:

CaUTION

aLWayS WEaR SaFETy GLaSSES DURING OPERaTION.
DO NOT STaRT OR RUN THE ENGINE WITHOUT OIL IN

THE HyDRaULIC RESERVOIR aND ENGINE.

Figure 18

Figure 19

beam mounting holes

5. Install high pressure hydraulic hose to pump/engine assem-

bly and hydraulic valve assembly Swivel end of hose goes on

pump. SEE FIGURE 22.

TIp: Jiggle the fitting while tightening to ensure that the fit-

ting seats properly.

6. Install hydraulic return line. Tighten with hose clamps. SEE

FIGURE 23.

7. See hydraulic filling instructions in "Operation" section.

Advertising