EarthQuake W2700B User Manual

Page 11

Advertising
background image

Operator's Manual

27-Ton Log Splitter, W2700

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5 CST

11

13. Lower the beam and cylinder assembly into the horizontal

position making sure the spring loaded lock pin on the

tongue engages the beam, securing it to the tongue. SEE

FIGURE 10.

14. Straighten the knuckle on the ram and slide the splitting

wedge back toward the cylinder so it couples with the ram

knuckle. Connect the wedge to the ram knuckle using the

wedge pin and two corresponding cotter pins. SEE FIG-

URE 11. Bend the ends of each cotter pin to keep them

from falling out.

15. Attach the valve control handle by removing the upper

pin from the valve. Position the grove on the bottom of

the control handle over the lower pin on the valve. Then

reinsert the upper pin through the holes in the valve and

control handle. Secure the valve handle pins in place using

the corresponding cotter pin. SEE FIGURE 12. Bend the

end of the cotter pin to keep it from falling out.

16. Remove any hydraulic port caps or plugs that are used to

close open hydraulic ports during transport.

Figure 11

Figure 10

spring loaded lock pin

wedge pin

ram knuckle

wedge

Figure 12

Advertising