Maintenance, Warning – EarthQuake 7055C User Manual

Page 14

Advertising
background image

OPERATOR INSTRUCTIONS ANd PARTS

SRT Model 7055C

Page 14

GetEarthquake.com

800-345-6007

SERvICING ThE ROTOTILLER

The following information will help you make the necessary checks
and perform the procedures required to follow the normal care
recommendations made for your rototiller unit.
If you prefer, your local authorized dealer can make these checks and
perform the required procedures for you.

To prevent accidental starting:

Engine must be turned off and cool, and spark
plug wire must be removed and secured from
spark plug before checking and adjusting engine
or equipment.

MAINTENANCE

MAINTENANCE SChEdULE

Your rototiller has been designed and produced by the industry’s leading manufacturer of outdoor power equipment to provide you
with years of reliable operation.
Keeping your tiller in top running condition will prolong its life, and help you obtain optimum performance.
Please read this normal care schedule, and note the recommended care operating intervals to extend the life of your unit.

Maintenance Operation

Page

Before

Each Use

50 hours or

Every Season

Change forward/reverse belt

15

x

Engine maintenance

16

x

x

Check or fill engine crankcase

16, EM

x

2

Check tiller transmission grease

16

x

Check tire pressure

16

x

Lubrication

17

x

Clean tine axle shaft

17

x

Lubricate wheel axle shaft

17

x

Check throttle control adjustment

EM

1

EM = See engine manual
1 Adjust throttle control after first 3 hours of operation or if engine is hard to start or run-on occurs.
 Change oil after first 5-8 hours of use, then after every 50 hours or every season. Change oil every 25

hours when operating under heavy load or in high temperatures.

WARNING

!

Advertising