East Coast Supercharging ECS Alky 5th Gen User Manual

Page 4

Advertising
background image

2) Nozzle mounting


The nozzle will require drilling a hole into the pipe leading to the throttle body.

Before it and after any sensors like a MAF(mass air flow). The size of hole is
13/32. Slightly larger than 3/8. In the case of thick aluminum flanges, a 1/8 NPT

tap can be used. The only tip’s are,

1) Make sure tip of screen on nozzle does not bottom out into 90

degree elbow,

2) Make sure you have at least 4 threads into elbow. Fittings are

brass and can break easy.

3) Once final assembly are done, go back unloosen elbow and apply

loc-tite to the threads so the nozzle cannot loosen.

Advertising