East Coast Supercharging ECS Stage 2 2003+ Fuel System User Manual

Page 12

Advertising
background image

Reinsert wire tool into backer plate
through return opening or one of the
screw holes to support backer plate
holding it against the back of the
tank.

Begin threading one of the provided allen bolts with
o-ring through pick up and into backer plate.

Install second allen bolt (with o-ring) and snug
down. Torque bots down to 12 ft/pounds.

Advertising