Echelon SmartServer 2.2 User Manual

Page 110

Advertising
background image

SmartServer

2.2 User’s Guide

111

Alternatively, you can click Setup and then click Verify.

2. The Setup - Verify Web page opens. This Web page lists the connections that have been

configured for the selected SmartServer including IP-852 routing and persistent GPRS settings.

3. Select the connections to be tested. The tests for all connections are selected by default.

4. Click Start Test to begin testing the selected connections.

5. The Progress box lists the verification events in the order they occur. The result of the connection

test is listed in the Status column. Any problems establishing communications with any of the
selected servers will be reported. To stop all ongoing tests anytime, click Cancel. To re-start the
previous set of tests, click Rebuild Test and then click Start Test. To clear the data in the
progress box, click Clear Progress.

Advertising