Echelon Lumewave CRD 3000 Street Light Bridge User Manual

Page 69

Advertising
background image

Street Light Bridge Integrator’s Guide

59

Black (Installed)

Commissioned. The device has successfully been

installed.

Orange (Installation in Progress)

Pending Commission. The Segment Controller has

identified that it needs to commission the device.

Pending Download. The Segment Controller has been

instructed to download an application image to the

device.

Never Reached. During the initial installation

attempt, the device has not received messages from the

Segment Controller.

Red (Error)

Commission Error. The device has not been

commissioned. Most likely this state is a result of a

communication failure, but it could also be caused by a

device failure.

Download Error. An application image has not been

downloaded to the device. Most likely this state is a

result of a communication failure, but it could also be

caused by issues such as the device having the wrong

model number, or the device and the application image

file (.apb extension) on the Segment Controller (to be

downloaded to the device) having mismatching program

IDs.

Message Error. The Segment Controller cannot

communicate with the device after the calculated

number of retries (this state is classified as a hard

message error). The Segment Controller regularly

attempts to communicate with the device over an

approximate 5 minute period. If the device does not

respond during this time, its Online Status is changed

from “Down” to “Confirmed Down”.

Advertising