Offset adjustment – Hanna Instruments HI 9910 User Manual

Page 20

Advertising
background image

20

SET

READ

4c
m

(1½")

HI 7007

Temp. compensation

selector

ATC

MTC

MTC

°C

-10

80

10

0

30

20

60

70

40

50

Make sure that the pH electrode and any ground probe have been
properly connected and wired to the controller (see preceding pages)
and that the meter is plugged to the mains.
Calibration should be ideally performed at a temperature similar to
that of the liquid to be monitored.
Use a Checktemp (or an accurate thermometer)
as reference for temperature compensation.
Remove the electrode cap if it is still on the
electrode.

During calibration, move the electrode and the
separate ground probe (if in use) together from
one buffer to the next.

If no separate ground probe is being used, make sure
that the Reference and the Matching Pin terminals are
shorted (see 14 - Functional Diagram).
If the electrode incorporates a ground probe/matching pin (HI 1003/3)
then remove the jumper.

• Turn the switch to the "READ" position.

OFFSET ADJUSTMENT:

• Rinse the tip of the electrode with pH

7.01 solution (

HI 7007), then dip the

bottom 4 cm (1.5”) of the electrode (and
ground probe) in the pH 7.01 buffer.

• Place the Checktemp thermometer in the buffer solution. Turn the

dial (see 10 - Functional Diagram) to show the same temperature

pH

pH

pH

pH

pH CALIBRATION

CALIBRATION

CALIBRATION

CALIBRATION

CALIBRATION

(HI 9910 and HI 9911)

4c
m

(1

½

")

HI 7007

4c
m

(1

½

")

HI 7007

Advertising
This manual is related to the following products: