Installation instructions, Mounting the i-26-em-b, Wiring – IOTA I-26-EM-B User Manual

Page 2: Installing the charge indicator, Installing the test switch

Advertising
background image

Page 2

INSTALLATION INSTRUCTIONS

CAUTION: Before installing, make certain the A.C. power is off and the
I-26-EM-B unit connector is disconnected.

1. MOUNTING THE I-26-EM-B

Mount

the

I-26-EM-B in the ballast channel or enclosed wireway so the wire leads are not exposed, at least

1

/

2

away from the A.C. ballast(s). Refer to illustrations 1 and 2.

When battery packs are remote mounted, consult Customer Service for the maximum allowable distance between

the battery pack and the lamp.

2. WIRING

Refer to the wiring diagrams on the back page for the appropriate wiring of lamp(s), ballast and

I-26-EM-B. Install

in accordance with the National Electrical Code and local regulations. For additional wiring diagrams not shown,
consult Customer Service.

3. INSTALLING THE CHARGE INDICATOR

Downlight Fixture– Select a convenient location on the fixture so that the

Charge Indicator can be seen after in-

stallation. Allow for proper clearance and drill or punch a

1

/

2

″ mounting hole. Disconnect the leads from the Charge

Indicator. Push the Charge Indicator into the

1

/

2

″ hole until it is firmly locked into place. Reconnect the leads,

observing proper polarity (Red/Black or Red lead w/connector to positive (+) red tab). Make certain all leads are
enclosed in an appropriate wireway. Refer to Illustrations 1 and 2.

NOTE: To ensure proper operation, use only the test accessories provided with the unit. See Page 1 of the Instruc-

tion Manual.

4. INSTALLING THE TEST SWITCH

Downlight Fixture– The test switch should be mounted on the fixture to allow access to authorized personnel. Drill

or punch a

1

/

2

″ mounting hole. Make certain all leads are enclosed in an appropriate wireway. Refer to Illustration 1.

Illustration 1

Downlight Fixture

Illustration 2

Charge Indicator

OBSERVE PROPER POLARITY

I-26-EM-B

NOTE: Position the Charge Indicator so that
it can be seen after installation.

+ RED
LEAD

WHITE/RED

LEAD

+ RED

Advertising