SOR Vane Operated Flow Switch User Manual

Flow switches, 900 series, General instructions

Advertising
background image

Form 588 (04.13) ©SOR Inc.

1/4

This device is intended as a flow/no-flow device only. It is not recommended
for use as an accurate measurement device. The 900 Series Flow
Switch is designed for vertical mounting only.

900 Series

Flow Switches

General Instructions

Registered Quality System to ISO 9001

Design and specifications are subject to change without notice.

For latest revision, go to www.sorinc.com

NOTE: If you suspect that a product is defective, contact the factory or
the SOR

®

Representative in your area for a return authorization number

(RMA). This product should only be installed by trained and competent
personnel.

Installation

Step 1 - Vane Length
Vane clearance is critical for proper operation of the switch. In order
to ensure this clearance, the following procedure should be followed:

Measure “C” on the existing pipe run (See

on page 2).

Trim vane (if necessary) to ensure a minimum of 3/16” vane clearance

when installed. Allow for thread engagement.

Step 2 - Installation

Thread bushing into pipeline coupling and align arrows in direction of flow.

(Arrows are located on fitting.)

Step 3 - Flow Adjustment
The flow rate on each switch may be externally adjusted following this procedure:

Remove the switch housing cover.

Remove the hex head plug located at the end of the enclosing tube (See

on page 2).



Adjust the switch adjustment screw to the flow required. To increase switching flow

rate, turn screw clockwise. Maximum flow adjustment is approximately 10 turns.

w

y or

mber

etent

rder

wed:

clearance

If vane is removed from unit for trimming, proper re-assembly is essential,
keeping small vane in its original position (See

on page 2).

Advertising