Rt housing mounting hardware, Maintenance – SOR RT Nuclear Qualified Pressure Switch User Manual

Page 4

Advertising
background image

4/4

Form 1472 (05.13) ©SOR Inc.

14685 West 105th Street, Lenexa, KS 66215

 913-888-2630  800-676-6794 USA  Fax 913-888-0767

Printed in USA

sorinc.com

RT Housing

Mounting Hardware

Fasteners per SOR Test
Report 9058-102 consist of
two 1/4-20, Grade 5 screws
(not supplied). Torque screws
to 70 to 85 in-lbs.
(7.9-9.6 N-m)

Maintenance

Replace cover gasket (SOR
P/N 8923-181) whenever
cover is removed or minimum
of once every 5 years,

Cover Screws

1/8 NPT(F)
Vent Connection

Body

Process Connection

(Pressure Port)

Mounting Holes

Conduit
Connection

whichever comes first. Remove the four cover screws. Remove old gasket. Place new
gasket between housing and cover. Line up holes in cover, gasket and housing. Insert the
4 screws and torque each to 7 to 10 in-lbs. (0.8-1.1 N-m)

Advertising