Treasure Garden GP12120 User Manual

Page 9

Advertising
background image

8

7

9

10

16

9

16

10

20

20

Corner Brace (Left)

Large Wrench

Corner Brace (Right)

Short Screw

19

19

Medium Screw

S T E P 7 Secure Pavilion Vertical Corner Posts to Horizontal Side

With the top section attached to posts - stand inside Pavilion. Secure each corner
section with corner brace (left) and corner brace (right). Tighten medium screws into
bottom of brace first, then short screws on top brace with large wrench. (See
illustration) NOTE: Short screws must be secured into each track adapter installed in
Step 1. Repeat for all sides.

25

28

1

45

6

7

2

3

28

Track Hooks

Walls

24 Plug

8

9 10

11 12

13 14

S T E P 8 Attach Walls (if ordered)

Slide 1 hook adapter all the way to the end on each corner and 1 in the center
before inserting track hooks. Unzip wall. Attach 14 track hooks to fabric wall per
diagram below. Then from outside the Pavilion, slide 7 track hooks into the horizontal
side beam, bottom track. Slide the remaining 7 track hooks into the outside adjacent
horizontal side beam, bottom track (see illustration). Insert 2 plugs to bottom track,
per side, to secure. Make sure that one track hook is between plug and hook adapter
at end corner. Repeat for all sides. Zip walls together. NOTE: When zipping walls
together, zipper starts at top and zips down.

Attach track hook

to fabric wall

Make sure one track
hook is between plug
and hook adapter at
end corner.

Slide hook adapters to ends and 1 in center

Advertising