AXING SKQ 4-01 User Manual

Page 2

Advertising
background image

Operation Instructions

SKQ 4-01

2

© AXING AG • Swizzerland • Reserving change in design and type - We cannot be held liable for printing error

14.06.12

Safety Notes!

•

Assembly, installation and service must be carried out by authorized and skilled electricians.

•

Switch off facility operating voltage or pull out mains plug before starting assembly or service work.

•

Facility assembly:

•

In dust-free, dry environment, protected against humidity, vapors, splash water and moisture. In a

location protected against solar radiation. Not within close distance of heat sources. In ambient
temperature of <50°C.

•

Ensure sufficient ventilation of the device. Do not cover the ventilation slots! - Avoid short circuits!

•

Damages arising from incorrect connection and/or improper operation are excluded from any liability.

•

Please observe all relevant standards, regulations and guidelines regarding installation and operation

of antenna facilities.

•

Ground SAT earth stations using equipotential bonding rails according to EN 50083-1, EN 60728-

11:2010.

•

Do not carry out any installation and service work during thunderstorms.

Advertising