CIRCUTOR TSA Series User Manual

Page 10

Advertising
background image

low range (30 to 100mA) For higher powers the threshold can be increased up to 300mA. In
case that the relay trips, check the leakage current.

REMARK! : In case that the loads are mainly single phase supplying computers, printers, speed
controllers , etc. , the trip threshold of leakage relay must be increased due to the EMI filters
leakage.

6

TROUBLE SHOOTING AND MAINTENENCE.

Check periodically that the earth leakage relay operates properly. Use the test push button of the
relay.

Check periodically that the rated power of the TSA is not surpassed because of the addition of
new loads. (Take into account the overload factor due to harmonics)

If new loads have to be added, take care of the load balance. Split the loads up in the three line
pairs (U2-V2, V2-W2, W2-U2) , see wire diagram.

7

SCHEMATICS

Advertising