Sc2400 setup and installation, Initial steps, Handling and unpacking the welder – Tru-Weld SC2400 Arc Welder User Manual

Page 9: Selecting a location, Electrical input requirement

Advertising
background image

 

SC2400 Setup and Installation 

Initial Steps

 

Only qualified personnel should perform this installation. 

 

Turn the input power off at the disconnect switch or fuse box before working on the welder. 

Do not touch electrically hot parts. 

 

This section provides detailed instructions for the proper installation of the TWE SC2400. It is 
recommended that these instructions be followed carefully to allow for the best possible operat‐
ing environment. 
 

Handling and Unpacking the Welder 

Immediately upon receipt of the welder, inspect the shipment for any damage and notify the 
carrier of such damage before accepting delivery. Then inspect welder for damage which may 
have occurred in transit. After removing the components from the shipping container(s), check 
the container for any loose parts. Remove all packing materials. Visually check all air passages of 
power source for any packing materials that may obstruct airflow through the welder. If the 
equipment is not being installed immediately, store it in a clean, dry, well‐ventilated area until in‐
stallation. 
 

Selecting a Location 

The location of the power source should be carefully selected to ensure satisfactory and depend‐
able service. Choose a location relatively close to a properly fused source of electrical power. Use 
care against toppling over if the machine is placed on a tilted surface or plane. It is important that 
the machine be located in an open area where air can circulate freely through the front and rear 
openings. If space is at a premium, leave at least 1 foot (300 mm) of clearance between the rear 
of the power source and wall or other obstruction. 

 

Electrical Input Requirement 

The welding power source is designed to be operated from three‐phase, 60Hertz, AC power sup‐
ply. Consult your local electrical utility if you have any questions on the electrical system at the 
present installation site.  The SC2400 should be operated from a separate, fused or circuit‐breaker 
protected circuit.  

Advertising