ZENNER SINGLE-JET METERS User Manual

Measuring capsule minolist 2, Installation instructions

Advertising
background image

The installation has to be done by qualified profes-
sional personnel. The general rules of technology
have to be followed.

Notes

Install vertically only, not tilted, inclined
or overhead.

Mount a ball valve upstream of the UPT.

Consider the correct flow direction. This is
indicated by an arrow on the side of the UPT.

The optimal depth (mid pipe below finished wall)
is 65 mm to 93 mm.

Capsule is delivered without inserted sealing ring
with loosely screwed tightening lid.

Installation UPT

1. Flush piping system
2. Close valves, release pressure and drain

the pipe.

3. If screwed:
a) Clean sealing surfaces and fit in new

sealing in the fittings.

b) Mount the UPT and tighten the screws.
4. If soldering:
a) Remove mounting accessory, tightening

lid and sealing ring.

b) Solder connections and let cool down

completely the UPT.

EnergyMetering

Measuring capsule Minolist 2”

(ER1 and ER2)

Installation instructions

Minolist ER 1

Minolist ER 2

Advertising