Cabinet preparation, Counter-sunk screws – DCS CS-364GL User Manual

Page 10

Advertising
background image

STEP 3:

(CONTINUED)

6) Cut the openings for the following installation:

Standard counter top installation, see Fig. 5A

Deep counter or island installation, see Fig. 5B

NOTE: If the deck is used, the sides or bottom of

the cutout may be solid combustible or
non-combustible material. If the bottom
is solid, provide a 6" x 6" cutout in the
left rear corner for the gas inlet and
power cord clearance.

CABINET PREPARATION

9

Flush with cabinets

Front projects outward as shown

from standard depth cabinet.

Front flush with cabinets; a minimum

of 25

3/4"

cabinet depth required

Fig. 2

Front flush with cabinets; a minimum of

25 3/4” cabinet depth required

Front projects outward as shown

from standard depth cabinet.

Flush with cabinets

Counter-Sunk Screws

Fig. 3

Counter-Sunk Screws

Advertising
This manual is related to the following products: