Rough-in installation – Blu Bathworks TSP811S User Manual

Page 3

Advertising
background image

2014-01

1 866 907 0122 blubathworks.com

®

2

Connect the

shower

Connect the

shower

Connect cold

inlet

Connect hot

inlet

Min/Max

guide on

mud guard

1

Rough-In Installation

Refer to illustration A for 811 series and illustration B for 821 series

Make sure the valve body is positioned according to valve markings so the inlets are situated

with hot piped on the left and cold piped on the right (refer to illustration 1).

IMPORTANT – Valve rough in depth is 1

5

8

” – 2

1

8

” (40-55mm) measured from the centerline of

the inlets to the surface of the finished wall.

Run

1

2

” (12.5mm) copper (or equivalent) supply lines to the proper height of the valve inlets and

be sure to secure all piping and fittings.

Fittings for the diverter valve should be installed at the same rough in depth as the valve body.

The primary fitting water source is provided at the top of the valve with the diverter fitting supply

provided at the bottom of the valve.

Tile guard should remain fixed until tile is complete and trim is installed.

Prior to tiling, Blu recommends that the valve be tested. Open the supply lines ensuring the

cartridge is closed and check all supply connections to the valve for possible leaks.

Open the cartridge and test both the primary fitting and the diverter for any possible leaks. At

this time ensure smooth water flow occurs through both fittings.

811 series rough-in connections

821 series rough-in connections

Connect to handheld shower or overhead rain shower.

Connect cold inlet

Connect hot inlet

Connect pipe to tub spout or overhead rain shower.

A

B

Advertising
This manual is related to the following products: