Bronkhorst IQ+FLOW Quick Start User Manual

Quick installation guide

Advertising
background image

Doc nr.: 9.17.074B Date: 14-04-2015

Quick Installation Guide

7c. Bus / Digital RS485 operation

With digital operation over RS485 a bus-system with multiple instruments can be set up. Refer to the “Instruction
Manual IQ

+

FLOW® series” for possible systems.

8a. Micro-switch operation (For Single-channel versions only)

Using the micro-switch on the instruments, several actions can be monitored

and started. The green LED is used for status indication. The red LED is used

for errors/warnings/messages. The micro-switch can be used to start several

actions, such as auto-zero, restore factory settings and bus-initialisation

actions, if applicable. See specific zero-procedure below and section 3.3 of

the Instruction Manual for more details.

Multi-functional switch

Status LED

Error/Warning LED

8b. Rotary switch operation (For Multi-channel versions only)

Select the communication type and Baud rate with the “COMM. TYPE”

switch. Select the node address with the “MSD” and “LSD” switch (e.g. MSD =

1 and LSD = 9 selects node 19 for channel 1, but also node 20 and 21 for

channels 2 and 3). See section 3.3 of the Instruction Manual for more details.

Unless specified otherwise, the IQ

+

FLOW® instrument is set for RS232 communication at 38k4 baud on node

address 03 by default.

Warm-up time:
Let the IQ

+

FLOW® warm-up for at least 30 minutes for best accuracy.

Do not apply pressure until electrical connections are made. When applying pressure to the system, avoid pressure

shocks in the system and increase pressure gradually. Also decrease pressure gradually when required.

9. Purging

In systems for use with toxic or other dangerous fluids, purging for at least 30 minutes with a dry, inert gas (like

Nitrogen or Argon) is absolutely necessary before use. After use with toxic or other dangerous fluids, complete

purging is also required before exposing the system to air.

10. Zeroing (optional)

The zero point of each instrument is factory adjusted. If required the zero point can be re-adjusted over RS232 or

by means of using the micro-switch. Procedure for zeroing by-micro switch (not for pressure meter/controller):

Warm-up, pressure up the system and fill the instrument according to the process conditions.
Make sure no flow is going through the instrument by closing valves near the instrument.
The setpoint must be zero.
Press micro-switch and hold it. After a short time the red LED will go ON and OFF, then the green LED will go ON.

At that moment release the micro-switch.
The zeroing procedure will start at that moment and the green LED will blink fast. The zeroing procedure waits

for a stable signal and saves the zero. If the signal is not stable, zeroing will take long and the nearest point to

zero is accepted. The procedure will take approximately 10 seconds.
When the indication is showing 0% signal and the green indication LED is burning continuously again, the zeroing

action was successful.

Ready
Your IQ

+

FLOW® instrument is now ready for operation.

Advertising