Ch. 2 installation, 1 unpacking – Comtech EF Data UB-54 User Manual
Page 15
Rev. 1
2–1
2
Chapter 2.
INSTALLATION
This chapter provides unpacking and installation instructions, and a description of
external connections.
2.1 Unpacking
The breakout panel and manual are packaged in a pre-formed, reusable, cardboard carton
containing foam spacing for maximum protection.
CAUTION
Do not use any cutting tool that will extend more than 1”, (2.540 cm), into the
container. This can cause damage to the breakout panel.
1. Cut the tape at the top of the carton, where it is labeled “OPEN THIS END.”
2. Lift out the cardboard/foam spacer covering the breakout panel.
3. Remove the breakout panel, manual, and power cord from the carton.
4. Save the packing material for reshipment.
5. Inspect the equipment for any possible damage incurred during shipment.
6. Check the equipment against the packing list to ensure the shipment is correct.
7. Refer to Section 2.2 for installation instructions.