3 spare parts, 4 recommended spares and consumable items – Flowserve ME User Manual
Page 29
ME USER INSTRUCTIONS ENGLISH 71576287 - 02/13
Page 29 of 36
flowserve.com
PUMP
Dimensions in mm (in.)
Gland packing
Stuffing
box
size
D1
D2
D3
D4
D5
L1
Qty
mm
(in)
ME 150-200
44/64
38 (1.50)
44 (1.73)
64 (2.52)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 150-500
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 200-250
44/64
38 (1.50)
44 (1.73)
64 (2.52)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 200-315
56/76
50 (1.97)
56 (2.20)
76 (2.99)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 200-355
56/76
50 (1.97)
56 (2.20)
76 (2.99)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 200-400
49/85
49 (1.93)
60 (2.36)
85 (3.35)
110 (4.33)
M14
65 (2.56)
5
12 (0.47)
ME 200-500
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 250-250
56/76
50 (1.97)
56 (2.20)
76 (2.99)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 250-315
56/76
50 (1.97)
56 (2.20)
76 (2.99)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 250-355
49/85
49 (1.93)
60 (2.36)
85 (3.35)
110 (4.33)
M14
65 (2.56)
5
12 (0.47)
ME 250-400
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 250-500
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 300-300
56/76
40 (1.57)
56 (2.20)
76 (2.99)
86 (3.39)
M12
45 (1.77)
4
10 (0.39)
ME 300-400
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 300-450
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 300-500
74/120
74 (2.91)
90 (3.54)
120 (4.72) 150 (5.90)
M16
64 (2.52)
4
14 (0.55)
ME 350-350
55/90
55 (2.16)
65 (2.56)
90 (3.54)
120 (4.72)
M16
65 (2.56)
5
12 (0.47)
ME 400-500
74/120
74 (2.91)
90 (3.54)
120 (4.72) 150 (5.90)
M16
64 (2.52)
4
14 (0.55)
ME 400-650
74/120
74 (2.91)
90 (3.54)
120 (4.72) 150 (5.90)
M16
64 (2.52)
4
14 (0.55)
ME 500-500
80/132
80 (3.15)
100 (3.94) 132 (5.20) 180 (7.09)
M16
72 (2.83)
4
16 (0.63)
6.2.6 Internal coating
If the pump has an internal coating, this coating
must be inspected periodically. Any wear or cracks
of the coating found must be immediately repaired.
Failure to do this may lead to accelerated wear of
the coating during operation and corrosion of the
exposed base metal, depending on the material and
pumped liquid. Special attention must be paid to the
coating edges. Any loss of coating material is
considered to be normal wear and tear on the pump
and is not considered as warranty. Flowserve has
applied the coatings according to the supplier's
instructions but will not be held responsible for
coating wear or cracks that may develop over time.
6.3 Spare parts
6.3.1 Ordering of spares
Flowserve keeps records of all pumps that have
been supplied. When ordering spares the following
information should be quoted:
1) Pump serial number.
2) Pump size
3) Part name
4) Part number
5) Number of parts required
The pump size and serial number are shown on the
pump nameplate.
To ensure continued satisfactory operation,
replacement parts to the original design specification
should be obtained from Flowserve. Any change to
the original design specification (modification or use
of a non-standard part) will invalidate the pump’s
safety certification.
6.3.2 Storage of spares
Spares should be stored in a clean dry area away
from vibration. Inspection and re-treatment of
metallic surfaces (if necessary) with preservative is
recommended at 6 monthly intervals.
6.4 Recommended spares and
consumable items
[1500], [2250], [3011], [3012], [4130], [4610]
a) Destroy all the gaskets after dismantling, replace
them when reassembling.
b)
It is recommended that bearings
are not reused after any removal from the shaft.
c) After serving during two years, replace the gland
packing.