Key wiring – Flowserve NRG 111-11 User Manual

Page 15

Advertising
background image

15

1

Flange PN 320, DN 50, DIN 2505-1
Flange PN 250, DN 80, DIN 2505-1

2

For the approval of the boiler standpipe with connecting flange the relevant regulations must be
considered.

3

Vent hole

Provide vent hole as close to the boiler wall as possible!

4

High water (HW)

5

Electrode rod d = 8 mm

7

Protection tube DN 100

8

Electrode distance

14 mm

9

Low water (LW)

0

Reducer DIN 2616-2, K-88.9 x 3.2 - 42.4 x 2.6 W

Key

Wiring

NRG 111-11

Note that screened four-core cable, e. g. I-Y(St)Y 2 x 2 x 0.8 or LIYCY 4 x 0.5 mm

2

is required for wiring

to the electrode.

Max. cable length 30 m with water conductivity from 0.5 µS/cm.

Max. cable length 15 m with water conductivity from 0.5 µS/cm when used in conjunction with inverter
URN 1 (24 d. c.).

1. Undo screws K and remove housing cover M. Fig. 7

2. Unscrew union nuts of cable entry L.

3. Slacken plug P with 18 mm open-end spanner but do not remove, fig. 8

The electrode terminal box can now be turned through +/– 180 °.

4. Turn electrode terminal box into desired position (+/– 180 °).

5. Tighten plug P slightly.

6. Remove terminal strip N from board.

7. Connect terminal strip according to wiring diagram.

8. Affix terminal strip.

9. Re-attach housing cover M and fix it with screws K.

Advertising