Installation – Flowserve PA46 User Manual

Page 15

Advertising
background image

5

PA 46, PA 47, MPA 46, MPA 47

Installation

The intermittent valve for removing boiler sludge can be installed in horizontal or vertical pipes.

The hand lever of the PA 46, PA 47 and the hand lever for the emergency operation of MPA 46, MPA 47

must be freely movable.

Flanged design

. Observe position of installation. The hand lever

1 or the hand lever for emergency operation 2

(MPA...) must be freely movable.

. Observe the direction of flow. The arrow indicating the flow direction is specified on the name

plate

E.

3. Consider space required for opening the valve. When the intermittent valve for removing boiler

sludge is installed, a minimum space of at least

150 mm is required for removing or retrofitting

the actuator!

4. Remove plastic plugs. They are only used as transit protection.
5. Clean seating surfaces of both flange faces.
6. Install intermittent valve for removing boiler sludge.

Socketweld design

. Observe position of installation. The hand lever

1 or the hand lever for emergency operation 2

(MPA...) must be freely movable.

. Observe the direction of flow. The arrow indicating the flow direction is specified on the name

plate

E.

3. Consider space required for opening the valve. When the intermittent valve for removing boiler

sludge is installed a minimum space of at least

150 mm is required for removing or retrofitting

the actuator!

4. Remove plastic plugs. They are only used as transit protection.
5. Clean socketweld ends.
6. Arc weld trap only manually (welding processes  and 4 in accordance with ISO 4063).

Risk of death, severe injuries, physical damage or destruction caused by explosive

mixtures!

If the equipment is electrically insulated and installed between pipe flanges, electrostatic

charges may build up.

When using the equipment in explosionrisk areas make sure that static electricity will

be discharged (earthing).

Danger

Attention

To avoid waterhammer lay the pipe downstream of the intermittent valve in such a way

that it has a slight fall, or evacuate the pipe before carrying out the boiler blowdown.

The length of the pipe between the steam boiler and the intermittent valve for removing

boiler sludge

must not exceed two metres!