Installation, Flange gaskets, Starting up – Flowserve NAF-Duball ball valves User Manual

Page 2: List of materials and spare parts

Advertising
background image

2

4.

Installation

Before installing the valve, ensure that the pipework is

free from impurities, that the pipe ends between which

the valve is to be installed are parallel and are correctly

aligned, and that the distance between the pipe ends

corresponds to the valve length, including gaskets. The

valve must not be used for drawing together or aligning

incorrectly run pipes as this will cause needless loads on

the valve and pipe which may lead to difficult damages

during comming operation. See Fig. 3.

Wrong installation

Correct installation

Fig. 3. Ensure that the pipe ends align and have the

correct distance

NAF-Duball valves can be installed in any position and

for either direction of flow.

However, we recommend that, if installed in a horizontal

run of pipe, the valve should be mounted with the stem

pointing vertically upwards.

The pipes should be supported on each side of the

valve, in order to relieve the valve of loads and avoid

vibrations.

Locate the valve so that it will be easily accessible for

inspection and service, particularly if the valve is equipped

with an actuator and a valve positioner.

5.

Flange Gaskets

Gaskets with sizes according to ANSI B16.5, Table E1

Figure E2, SS 359 or DIN 2690 are recommended.

6.

Starting up

Before starting up, flush the pipework - with all valves

in the open position - so that any impurities that may

damage the sealing surfaces of the valve and impede its

operation will be flushed away.

See also Fi 41.82 - Instruction Manual for NAF valve

positioner giving useful hints for starting up.

7.

List of Materials and Spare Parts

Item

Qty

Part

Material

1

1

Body

EN 1.4408/CF8M

2

1

Body

EN 1.4408/CF8M

3

1

Ball

EN 1.4408/CF8M

4*

2

Seat ring

PTFE carbon reinforced 10%

5

1

Stem assembly

EN 1.4460

6

1

Circlip

Spring steel

7

1

Backing ring

PTFE

8

1

Washer

A4

9

**

Screw

A4

10*

1

Backing ring

PTFE

11*

2

O-ring

EPDM

12*

2

Bushing

PTFE carbon reinforced

13*

1

Anti-friction

washer

PTFE carbon reinforced

14*

1

Seal ring

PTFE

15

1

Bolt

A4

16

1

Nut

A4

17

1

Stud

A4

18

2

Key

Steel

19

1

Ball

EN 1.4408/CF8M hard chrome

plated

20

1

Ball

Alloy 6

21

2

Seat ring

SS/Alloy 6

22*

2

Seat seal

PTFE carbon reinforced

23

1

Gland cover

EN 1.4408/CF8M

24*

1

Boxpacking

Graphite

25

2

Bolt

A4

26

2

Nut

A4

27

1

Split ring

EN 1.4436

28

1

Ring

Alloy 6

29

2

Bushing

Alloy 6

30*

1

Seal ring

Graphite

31*

2

Seal ring

Graphite

32

1

Stem extension

EN 1.4460

33

2

Actuator yoke

Zink plated steel

34

1

Stop screw

A4

* Recommended spare parts

** Qty depends on the DN.

Items 23—34 are for the stuffing box version for 350°C. Material combinations others than

those specified are available to order - consult your NAF representative.

Advertising