Disassembly Procedures

1. Disconnect all air and electrical supplies from

actuator.

2. Remove all accessories from actuator and dismount

from valve.

Spring Group

1. Apply air pressure to the Pneumatic Cylinder to

release spring pressure from the Stop Bolt (16). Remove

both Stop Bolts (16) and release air pressure. This will

relieve the majority of the spring preload.

NOTE: PERSONAL INJURY may result if Step 2 is

attempted before Step 1 is completed.

2. The Spring Cartridge (11) is welded into an integral

component and cannot be disassembled. To remove from

actuator, remove Spring Cartridge Nuts (41) and

Lockwasher (42). At this point, all spring forces are

contained within the welded cartridge and the spring

cartridge can be removed from the center body.

NOTE: Support the Spring Cartridge (11) during removal

so as not to damage the Piston Rod (3).

Rod Cover (Double Acting Actuators)

1. Remove the Rod Cover Bolts (40) and Lockwashers

(42). The Rod Cover (11) can now be removed from the

Housing (1), taking care not to damage the Piston Rod

(3).

Pressure Group

1. Remove the Tie Rod Nuts (28), Tie Rods (27), and the

Endcap (29).

2. Slide the Cylinder (23) over and off of the Piston (24),

being careful not to scratch or dent the honed and chrome

plated surface of the cylinder (23).

3. Remove the Piston Bolt (25), Piston Bolt Lockwasher

(26) and remove the Piston (24) and Piston Face Seal

(32).

4. Remove the Adapter Bolts (43) and carefully slide the

Adapter (22) over the Piston Rod (3).

Housing or Body Group

1. Unscrew the Inspection Cover Screws (9) and

Lockwashers (10) and remove the Cover (8) and the Cover

Gasket (35).

NOTE: Prior to disassembly of remainder of the Body

Group, you should check visually through the inspection

opening to determine whether further disassembly is

necessary. If the Yoke (4), the Yoke Pin (5), and the

Yoke Pin Rollers (6) are in good condition, do not

disassembly further.

2. To remove the Piston Rod (3) and Piston Rod Bearing

(2), center the Yoke in the Mid or 45 degree position.

RN2 Actuators: To remove the Yoke Pin Retainers (7),

use snap ring pliers with 90 degree tips through the

inspection cover opening. Turn the Piston Rod (3) to

remove the Yoke Pin Rollers (6) and the Yoke Pin (5)

through the inspection cover opening.

RN3 and RN4 Actuator: Remove both freeze plugs

that are located in the Housing near the Bearing Retainer

(13). Through these openings the Snap Ring, Yoke Pin

Retainers (7) can be removed. The Yoke Pin Rollers (6)

can now be slipped off of the Yoke Pin (5), and the Yoke

Pin (5) can be pushed through the Piston Rod (3) and out

through the opening in the other side of the housing.

Remove Piston Rod (3) and Piston Rod Bearings (2) at

this time, using care not to scratch the surface of the

Piston Rod.

3. Unscrew the Bearing Retainer Bolts (14) and remove

the Bearing Retainer (13), the Retainer Gasket (37), and

the Torque Shaft Seal (38) from the valve mounting side of

the actuator.

4. The Torque shaft (20) may be tapped out using a soft

faced hammer. Use care not to drop the shaft or the

Bearing (12) when they come out. After removal of the

Torque Shaft (20) repeat step 3 on accessory side.

B00143-0

Page: 2 of 4

11444 Deerfield Road
Cincinnati, Ohio 45242
(513) 489-7800

Maintenance Instructions

Nuclear Qualified Actuator