Geist SA1-03001 User Manual

Opengate installation guide, Switchair 3u installed in rack

Advertising
background image

SA1-03001 Specifi cation

Chassis Depth
7”
Channel Length
27.5”
Airfl ow
Switch Generated (Passive)
Switch Intake/Exhaust
Side/Side-Rear
Warranty
Lifetime

Network Switch

SwitchAir

Cool Air Delivery

Rack Front

Rack Rear

SwitchAir 3U Installed in Rack

Opengate Installation Guide

SA1-03001 SwitchAir

For Side Air Intake Switches

Installation Precaution:
• Install SwichAir such that the required airfl ow for safe operation of
equipment is not compromised.
• Take precaution to avoid interference with the switch input power
cords when installing on a live unit.

Delivers cool air to network switches with side air intake.
Installs in minutes while network switch is live.

Why Choose Opengate?

• Stabilize your switch intake air
temperature to within a few degrees
of the rack front intake air temperature

• Installs in minutes and works with
most side and rear intake network
switches

• SwitchAir 3U can be installed while
network switch is operational

• SwitchAir 3U ensures the network
switch is able to receive the required
cool air from outside the rack

• Network switch pulls air through
the SwitchAir Chassis

10001701

Advertising