Harken 1988 Mastbase Block User Manual

Mastbase blocks, Over-the-top blocks

Advertising
background image

I N S T R U C T I O N S

Mastbase Blocks

1988, 1990, 3123, C8508

Over-the-Top Blocks

3002, 3003, 3004, C8322, C8624

N15W24983 Bluemound Rd. • Pewaukee, WI 53072 U.S.A.

Telephone: (262) 691-3320 • Fax: (262) 701-5780

Web: www.harken.com • E-mail: [email protected]

Install 1988,1990, 3123 Mastbase Blocks

Part

No.

Block

Max

Line Ø

Maximum

Working Load

(MWL)

Breaking Load

(BL)

Purchase

Fasteners (FH)

A4 (316) or A2 (18-8)

stainless steel

Size

Type

Qty

1988

Mastbase

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

3

1990

Mastbase

1

/

2

"

12 mm

5000 lbs

2273 kg

10000 lbs

4536 kg

5

/

8

"

16 mm Flathead

4

3123

Mastbase

11

/

16

"

18 mm

11000

4990 kg

22000 lbs

9980 kg

5

/

8

"

16 mm

Hexhead

Bolt

2

C8508

Mastbase

3

/

4

"

19 mm

15000

6804 kg

30000 lbs

13608 kg

5

/

8

"

16 mm

Hexhead

Bolt

3

3002 Over the top

single

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

2

3003 Over the top

double

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

4

3004 Over the top

triple

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

6

C8322 Over the top

single

1

/

2

"

12 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

2

C8624 Over the top

single

9

/

16

"

14 mm

5000 lbs

2272 kg

10000 lbs

4536 kg

5

/

8

"

16 mm Flathead

2

Strictly follow all instructions to avoid an accident, damage

to your vessel, personal injury, or death. See www.harken.com/

manuals for additional safety information.

Note: Install blocks so sheave is leaning away from mast. “Harken”

will be towards mast. See drawing below.
1. Remove sheave. Remove screw from port side of assembly. Pull

out centerpost from starboard side.

Tip: Don’t worry about losing balls in sheave, they are captive. If

post is stuck, leave screw halfway in and push on screw head to

push post out port side.
2. Mark position of holes. Keep “Harken” towards mast.

Flat in hole

retains post

Mast

Port Side: “Harken” must be towards mast.

Tip: To make sure block is aligned with load, drill forward hole, insert

screw and sheave, run line to deck block and let block center itself.

Remove and drill other hole(s).
3. Mount carrier. Drill holes and screw to deck using sealant, backing

plates, and locknuts. 1988, 1990Do not overtighten screws; sheave

will bind. Tip: Slightly bevel top of hole in deck to allow sealant to mass

near top of hole.
4. Installing sheave: Slip post in from starboard side and seat end of shaft

in flat. Use blue Loctite

®

provided on screw and secure.

WARNING! You must mount to solid deck construction using speci-

fied fasteners in all mounting holes and nuts, washers or backing

plates to achieve correct maximum working load.

I N S T R U C T I O N S

Mastbase Blocks

1988, 1990, 3123, C8508

Over-the-Top Blocks

3002, 3003, 3004, C8322, C8624

N15W24983 Bluemound Rd. • Pewaukee, WI 53072 U.S.A.

Telephone: (262) 691-3320 • Fax: (262) 701-5780

Web: www.harken.com • E-mail: [email protected]

Install 1988,1990, 3123 Mastbase Blocks

Part

No.

Block

Max

Line Ø

Maximum

Working Load

(MWL)

Breaking Load

(BL)

Purchase

Fasteners (FH)

A4 (316) or A2 (18-8)

stainless steel

Size

Type

Qty

1988

Mastbase

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

3

1990

Mastbase

1

/

2

"

12 mm

5000 lbs

2273 kg

10000 lbs

4536 kg

5

/

8

"

16 mm Flathead

4

3123

Mastbase

11

/

16

"

18 mm

11000

4990 kg

22000 lbs

9980 kg

5

/

8

"

16 mm

Hexhead

Bolt

2

C8508

Mastbase

3

/

4

"

19 mm

15000

6804 kg

30000 lbs

13608 kg

5

/

8

"

16 mm

Hexhead

Bolt

3

3002 Over the top

single

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

2

3003 Over the top

double

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

4

3004 Over the top

triple

3

/

8

"

10 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

6

C8322 Over the top

single

1

/

2

"

12 mm

2500 lbs

1136 kg

5000 lbs

2272 kg

5

/

8

"

16 mm Flathead

2

C8624 Over the top

single

9

/

16

"

14 mm

5000 lbs

2272 kg

10000 lbs

4536 kg

5

/

8

"

16 mm Flathead

2

Strictly follow all instructions to avoid an accident, damage

to your vessel, personal injury, or death. See www.harken.com/

manuals for additional safety information.

Note: Install blocks so sheave is leaning away from mast. “Harken”

will be towards mast. See drawing below.
1. Remove sheave. Remove screw from port side of assembly. Pull

out centerpost from starboard side.

Tip: Don’t worry about losing balls in sheave, they are captive. If

post is stuck, leave screw halfway in and push on screw head to

push post out port side.
2. Mark position of holes. Keep “Harken” towards mast.

Flat in hole

retains post

Mast

Port Side: “Harken” must be towards mast.

Tip: To make sure block is aligned with load, drill forward hole, insert

screw and sheave, run line to deck block and let block center itself.

Remove and drill other hole(s).
3. Mount carrier. Drill holes and screw to deck using sealant, backing

plates, and locknuts. 1988, 1990Do not overtighten screws; sheave

will bind. Tip: Slightly bevel top of hole in deck to allow sealant to mass

near top of hole.
4. Installing sheave: Slip post in from starboard side and seat end of shaft

in flat. Use blue Loctite

®

provided on screw and secure.

WARNING! You must mount to solid deck construction using speci-

fied fasteners in all mounting holes and nuts, washers or backing

plates to achieve correct maximum working load.

Advertising