Harken 7413.10 MKIV Jib Reefing & Furling built after Feb. 2009 User Manual

Mkiv jib reefing & furling unit 3, 4

Advertising
background image

Please read these instructions carefully before installing, servicing, or operating the equipment.

This manual may be modified without notice. See: www.harken.com/manuals for updated versions.

PLEASE SAVE THESE INSTRUCTIONS

MKIV JIB REEFING & FURLING

Unit 3, 4

Installation Manual – Intended for specialized personnel or expert users

4673 11/14

Preassembly

Safety precautions/parts descriptions

2

Sizing check

3

Parts

4 - 5

Line/rigging parts check/tools

6

Dimensions/sailmaker's instructions

7

Toggle deductions/stay into foil options

8

Top foil length Unit 3/Unit 4

9 -10

Short top foil Unit 3/Unit 4

11 - 12

Confirm foil length

13

Assembly

Foils/connectors

14 - 20

Halyard swivel

20

Drum assembly

21

Rod rigging

22

Attach turnbuckle/toggle

23

Attach toggle/short length plate

24

Attach toggle/long length plate

25

Feeder/final 26

Commissioning–Unit 3/4

Turnbuckle on boat

27

Lead line to cockpit

28

Halyard wrap/prevent halyard wrap

29

Pendant/halyard: restrainer/ halyard tension 30

Commissioning—Unit 4

Tying soft attachment tack/head/halyard

31

Operation

Halyards/headstay tension

32

Raise sails/storm sails/reefing

33

Reef/secure sail

34

Race conversion

35

Maintenance

Clean/inspect 36
Replace line

36

Storage/remove furler

36

Troubleshoot

37

Warranty

37

Appendix

38 - 41

Advertising
This manual is related to the following products: