Infloor 30063 4 Zone Valve Control User Manual

Infloor Radiators

Advertising
background image

31063-31064

MULTI- ZONE ZONE VALVE CONTROL

INSTALLATION

AND OPERATING INSTRUCTIONS

FEATURES

.
.
.

.
.
.

.

.

.
.

.
.

.

Front panel indicator lights
Field selectable Priority
Priority timer for protection of a priority zone malfunction

and prevention of freeze-ups in the heating zones

Unlimited zone expansion
Isolated End Switch
Three-minute End Switch delay timer for two wire type

zone valve applications. Circulator will start only after
the zone valve is fully opened.

DIP switch for easy setup of two wire type zone valve

applications. No need to hook up wire jumper on the
third and fourth terminals on each zone

Works with two, three or four wire type zone valves and

thermostats

Compact and modern design

Fuse protection

Pre-wired terminals for circulator
SPDT Priority zone 1 relay switch (N/O Com N/C).
Capable of prioritizing DHW pump in a 2-pump system
50VA replaceable transformer

.
.
.
.

.

.
.

Simplified wiring
Contractor friendly PCB layout
Easy-Connect Screwless Terminals
24VAC transformer output with common terminal

provides compatibility with electronic thermostats

Universal thermostat compatibility

100% Factory Tested
Extended three year warranty

APPLICATION

The

series multi-zone zone valve controller is

operated by low voltage thermostats or any other low
voltage controllers having an SPST switching action.
The -Link controller provides intermediate switching to
permit up to six zone valves and a boiler operating control
in a multi-zone hydronic heating system.

Intelligent Linking System ( -Link) allows unlimited zone
expansion with additional

-Link controllers.

The panel

provides EZ screwless terminal blocks for

connections to the thermostats and zone valves. LED
indicators on the front panel provides functional status and
easy troubleshooting.

i

-Link

i

i

i

Field

selectable priority with protection timer prevents freeze-
ups in the event of a priority zone failure. The three-minute
delay timer let the two wire type zone valve fully open
before turning on the circulator.

SPECIFICATIONS

Model:

31063 4 Zone Valve Control

31064 6 Zone Valve Control

Power Supply:

120VAC, 50/60Hz

Transformer:

50VA

Dimensions:

11.25”(W) x 6.5”(H) x 3”(D)

Electrical Switch Rating:

10 A 1/3 HP @ 120VAC

Thermostat Anticipator Setting: 0.18 A
Shipping Weight:

4.5 lbs.

CAUTION!

1. To prevent electrical shock hazard, disconnect power supply

before installing.

2. All wiring must comply with national and local electrical codes,

ordinances, and regulations.
Never connect the load terminals to a load that takes more
current than the amount listed for the relay in the electrical
ratings.

3. Azel Technologies is not responsible for damages resulting from

misuse of its products.

4. 12-22 gauge wire is recommended for thermostat connections.
5. This literature is provided for informational purposes only.

OPERATION

When any zone (thermostat) calls for heat, the corresponding
yellow light turns on and zone valve is energized. When zone valve
is fully opened, the red light turns on and End Switches (X-X) is
closed (to start boiler) while 120VAC power is supplied to start the
circulator through “CIRC” terminals. Also, when zone 1 calls for
heat, an additional SPDT End Switch is energized.

DOMESTIC HOT WATER PRIORITY OPERATION

When zone 1 priority switch is set to

, zone 1(domestic hot water

zone) has priority control over zone 2 to 6(heating zones). If zone 1
is calling for heat, zone valves 2 to 6 are disabled until zone 1
domestic hot water demand is satisfied.

When zone 1 priority switch is set to

(factory setting) all zones

operate independently of each other.

When zone 1 priority switch is set to

(Priority Protection

Timer mode), if the priority zone calls for domestic hot water for
more than one hour(eg. In case of a priority zone failure such as a
faulty indirect water heater controller keeps calling for heat or
leaking situation), all the heating zones (2 to 6) are released from
locking out and they are returned to normal operation. This features
helps prevent freeze-ups in the event of zone 1 failure. Once the
priority zone 1 is satisfied, the priority timer is reset to allow priority
for another one hour.

Note: It is important to set the slide switch before turning on the

power.

ON

OFF

,

TIMER

Advertising
This manual is related to the following products: