Sheet2, Drawing view6, Drawing view7 – Legrand OR-HDJ5E-00 User Manual

Page 2

Advertising
background image

R

125 EUGENE O'NEILL DRIVE

NEW LONDON, CT 06320

TEL: 860-445-3800

FAX: 860-405-2990

WWW.ORTRONICS.COM

SIMULATED RACK

SECTION

WITH NUTS PROVIDED ATTACH WIRE

MANAGEMENT BAR TO PANEL BRACKETS.

TIGHTEN NUTS.

NUT

PANEL

BRACKET

WIRE

MANAGEMENT BAR

PANEL

SCREWS

PANEL

SCREWS

WIRE

MANAGEMENT BAR

PANEL MOUNTING INSTALLATION

CABLE MANAGEMENT INSTRUCTIONS (TOP VIEW)

BEND

RADIUS*

* THE MINIMUM CABLE BEND RADIUS IS 4 TIMES THE OUTSIDE CABLE DIAMETER.

HOOK LOOP TIE WRAPS SHOULD BE USED TO ATTACH THE CABLES TO THE WIRE

MANAGEMENT BAR. THE CABLE AT THE EDGE OF THE PATCH PANEL SHOULD BE

ATTACHED TO THE CABLE WHICH HAS ALREADY BEEN TIE WRAPPED TO THE WIRE

MANAGEMENT BAR.

HOOK LOOP TIES

ATTACH PANEL TO RACK WITH

SUPPLIED SCREWS.

TITLE:

INSTRUCTION SHEET #:

REV:

ECN #:

SHEET:

HDJ PANEL INSTALLATION INSTRUCTIONS

71601790

01 04319

PG 2 OF 2

Advertising